{"id":35315,"date":"2026-08-31T15:50:00","date_gmt":"2026-08-31T19:50:00","guid":{"rendered":"https:\/\/www.ecoportal.net\/en\/?p=35315"},"modified":"2026-08-31T15:50:00","modified_gmt":"2026-08-31T19:50:00","slug":"operators-pointed-347-000-motorized-mirrors","status":"publish","type":"post","link":"https:\/\/www.ecoportal.net\/en\/operators-pointed-347-000-motorized-mirrors\/35315\/","title":{"rendered":"Operators pointed 347,000 motorized mirrors at three towers in the Mojave for a decade, and the flat panels they were built to beat make power for roughly a third of what those mirrors charge"},"content":{"rendered":"<p>Each one is about the size of a garage door.<\/p>\n<p>Two panes of glass on a steel post, a small motor on each axis, and a controller that knows where the sun is and where the target is.<\/p>\n<p>Alone it is a curiosity.<\/p>\n<p>Put enough of them on a desert floor and aim every one at a single point, and you have close to&nbsp;<strong>600 acres<\/strong>&nbsp;of glass working as one lens.<\/p>\n<p>The target is a boiler.<\/p>\n<p>Everything about the design is&nbsp;<strong>mechanically honest<\/strong>, and for a decade it did more or less what the drawings said it would, which turned out not to be the&nbsp;<strong>question that mattered<\/strong>.<\/p>\n<h2>Why concentrating light was supposed to win<\/h2>\n<p>A photovoltaic panel makes electricity directly and cannot store it.<\/p>\n<p>Sunlight hits silicon, electrons move, and the moment the light stops the output stops, which leaves a battery as the only way to shift any of it into the evening.<\/p>\n<p>Concentrating sunlight makes heat instead.<\/p>\n<p>Heat can sit in a tank of molten salt for hours and still spin a turbine after dark, which is the one thing the mirror approach could do that&nbsp;<strong>silicon could not<\/strong>.<\/p>\n<p>This plant was built without that.<\/p>\n<p>The mirrors here boil water directly and the steam goes straight to the turbine, so when the sun goes behind a cloud the output falls with it and&nbsp;<strong>nothing is banked<\/strong>, which surrendered the&nbsp;<strong>single advantage<\/strong>&nbsp;the technology had.<\/p>\n<h2>What is standing out there<\/h2>\n<p>The site covers about 3,500 acres of the California desert near the Nevada line.<\/p>\n<p>On it stand&nbsp;<strong>173,500 heliostats<\/strong>, each carrying two mirrors, arranged in rings around three towers of roughly 459 feet.<\/p>\n<p>Rated output is 392 megawatts.<\/p>\n<p>That made it the largest plant of its kind anywhere when it started up in February of 2014, built for&nbsp;<strong>2.2 billion dollars<\/strong>&nbsp;with a&nbsp;<strong>1.6 billion dollar<\/strong>&nbsp;federal loan guarantee behind it.<\/p>\n<p>The site was never quiet either.<\/p>\n<p>Construction ran from late 2010 to early 2014 across ground that had to be cleared of desert tortoises first, at a scale that made the project a permitting case study before it made a single kilowatt hour.<\/p>\n<p>Anyone driving to Las Vegas has seen it.<\/p>\n<p>The whole field sits beside the interstate, and the towers are bright enough at midday to be uncomfortable to look at from the road.<\/p>\n<h2>The numbers it was measured against<\/h2>\n<p>The contract asked for about a million megawatt hours a year.<\/p>\n<p>The best year it ever managed was&nbsp;<strong>856,301 megawatt hours<\/strong>, in 2020, and the first year of operation delivered under 40 percent of what had been expected.<\/p>\n<p>The design assumed a capacity factor of 28.5 percent.<\/p>\n<p>Actual performance ran nearer&nbsp;<strong>24 percent<\/strong>, which sounds like a small gap until it is multiplied across a thirty year contract.<\/p>\n<p>Then there is the price.<\/p>\n<p>The power sells at more than&nbsp;<strong>13.5 cents<\/strong>&nbsp;a kilowatt hour, while unsubsidized utility scale panels now come in between 3.8 and 7.8 cents, so the panels are not half the price but closer to a third.<\/p>\n<h2>The regulator refused to let it close<\/h2>\n<p>The utility and the owners agreed to end two of the three contracts thirteen years early.<\/p>\n<p>The state commission rejected that agreement on the fourth of December last year, unanimously and&nbsp;<strong>without prejudice<\/strong>, which means it can be brought back.<\/p>\n<p>The reason was not sentiment.<\/p>\n<p>Ratepayers have already paid,&nbsp;<a href=\"https:\/\/docs.cpuc.ca.gov\/PublishedDocs\/Published\/G000\/M590\/K550\/590550933.PDF\" target=\"_blank\" rel=\"noopener\">the resolution<\/a>&nbsp;notes, more than&nbsp;<strong>333 million dollars<\/strong>&nbsp;for transmission built to serve this plant, and switching it off risks stranding more than the termination would save.<\/p>\n<p>Reliability did the rest of the work.<\/p>\n<p>Federal policy shifts have made new project build out uncertain, demand from data centers is climbing, and the commission decided it would rather keep&nbsp;<strong>expensive generation<\/strong>&nbsp;than lose it with nothing named to replace it.<\/p>\n<p>The Pulse covered that rejection when&nbsp;<a href=\"https:\/\/www.ecoportal.net\/en\/mojave-heliostats-plant-shutdown-deal-rejected-regulator\/35120\/\">the regulator<\/a>&nbsp;handed the deal back.<\/p>\n<h2>What is still unresolved<\/h2>\n<p>The loan has not been fully repaid.<\/p>\n<p>An internal audit puts the outstanding figure at roughly&nbsp;<strong>780 million dollars<\/strong>, a number neither the owners nor the department has confirmed publicly.<\/p>\n<p>The birds are the other open file.<\/p>\n<p>Estimates of annual mortality from collisions and from the concentrated beam itself have ranged from&nbsp;<strong>3,500 to 6,000<\/strong>, and that toll was part of why the federal side supported closing it.<\/p>\n<p>The technology itself is not the loser here.<\/p>\n<p>Towers with storage do exactly what this one could not, as a Chinese field of 12,000 mirrors demonstrates by running&nbsp;<a href=\"https:\/\/www.ecoportal.net\/en\/china-12000-desert-mirrors-grid-solar\/13536\/\">after dark<\/a>&nbsp;for eight hours at a stretch.<\/p>\n<p>The utility can file again if a replacement is ever named, which is what&nbsp;<a href=\"https:\/\/www.pv-magazine.com\/2025\/10\/07\/californias-ivanpah-csp-closure-shows-tech-shift-not-solar-decline\/\" rel=\"nofollow noopener\" target=\"_blank\">the trade press<\/a>&nbsp;reads as a technology shift rather than a retreat from solar.<\/p>\n<p>Until then the field keeps tracking.<\/p>\n<p>Every one of those&nbsp;<strong>motorized mirrors<\/strong>&nbsp;still turns through the day, aimed at a boiler nobody wants the output from, under a contract nobody is allowed to cancel.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Each one is about the size of a garage door. Two panes of glass on a steel post, a small motor on each axis, and a controller that knows where the sun is and where the target is. Alone it is a curiosity. Put enough of them on a desert floor and aim every one &#8230; <a title=\"Operators pointed 347,000 motorized mirrors at three towers in the Mojave for a decade, and the flat panels they were built to beat make power for roughly a third of what those mirrors charge\" class=\"read-more\" href=\"https:\/\/www.ecoportal.net\/en\/operators-pointed-347-000-motorized-mirrors\/35315\/\" aria-label=\"Read more about Operators pointed 347,000 motorized mirrors at three towers in the Mojave for a decade, and the flat panels they were built to beat make power for roughly a third of what those mirrors charge\">Read more<\/a><\/p>\n","protected":false},"author":28,"featured_media":35317,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rank_math_focus_keyword":"operators pointed 347","rank_math_title":"Operators pointed 347,000 motorized mirrors at three towers in the Mojave for a decade, and the flat panels they were built to beat make power for roughly a third of what those mirrors charge","rank_math_description":"The Ivanpah solar plant covered 5 square miles of Mojave Desert with 347,000 tracking mirrors, then regulators blocked its closure as flat panels cut its","footnotes":""},"categories":[8],"tags":[],"class_list":["post-35315","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy"],"_links":{"self":[{"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/posts\/35315","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/comments?post=35315"}],"version-history":[{"count":1,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/posts\/35315\/revisions"}],"predecessor-version":[{"id":35724,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/posts\/35315\/revisions\/35724"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/media\/35317"}],"wp:attachment":[{"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/media?parent=35315"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/categories?post=35315"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/tags?post=35315"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}