{"id":43329,"date":"2026-10-20T17:50:00","date_gmt":"2026-10-20T21:50:00","guid":{"rendered":"https:\/\/www.ecoportal.net\/en\/?p=43329"},"modified":"2026-10-20T17:50:00","modified_gmt":"2026-10-20T21:50:00","slug":"floodwater-tore-out-steel-tubes-wind","status":"publish","type":"post","link":"https:\/\/www.ecoportal.net\/en\/floodwater-tore-out-steel-tubes-wind\/43329\/","title":{"rendered":"Floodwater tore out a stone bridge in the Yorkshire Dales overnight, so crews rolled in two 20 foot steel tubes built for a scrapped wind farm"},"content":{"rendered":"<p>A stone bridge in the Yorkshire Dales vanished in a single night.<\/p>\n<p>Floodwater came down Swaledale carrying boulders and debris.<\/p>\n<p>By morning, the crossing over Cogden Beck near Grinton was gone.<\/p>\n<p>A road to the nearest market town went with it.<\/p>\n<p>Engineers needed something <strong>enormous and already built<\/strong>, something nobody was using.<\/p>\n<p>They found it in a steel stockyard, fabricated for a wind farm that never happened.<\/p>\n<h2>What a wind farm substructure was doing in a moorland stream<\/h2>\n<p>The tubes began life as part of a turbine substructure, built for a floating wind demonstration off the north coast of Scotland. The steel belonged to the failed Dounreay Tr\u00ec project, a roughly <strong>10 megawatt floating wind<\/strong> farm planned a few miles offshore, which was shelved for lack of funding. Instead of being cut up, the finished sections sat waiting for a buyer.<\/p>\n<p>A steel stockholder saved the substructure from being scrapped and stored the sections on its <strong>100 acre stockyard<\/strong> near Thirsk, North Yorkshire. The firm specializes in supplying <strong>surplus steel for reuse<\/strong> in construction and infrastructure projects.<\/p>\n<p>That decision, made with no bridge in mind, turned out to matter. A tube built to hold a turbine in the open sea has to resist forces nothing in a modest Dales beck ever delivers.<\/p>\n<h2>A structure built for the open sea, dropped into a beck<\/h2>\n<p>Picture the beck first. Cogden Beck is a small moorland stream on Grinton Moor, unremarkable on an ordinary day. The stone bridge over it was destroyed by <strong>torrential water carrying boulders<\/strong> and other debris during the floods of late July.<\/p>\n<p>Into that gap went steel designed for a far harsher environment. Each section runs about twenty feet long and weighs roughly <strong>23,000 pounds<\/strong>. The giant hollow drums measure <strong>just over seven feet<\/strong> across and about an inch and a quarter thick.<\/p>\n<p>The two repurposed tubes arrived at the remote spot on the back of a low loader and were rolled into Cogden Beck. A tracked excavator working from the bank then positioned them in the stream. They formed a base with the load bearing capacity needed for a <strong>temporary road surface<\/strong>, with water running through them rather than over the deck. You can read the trade account of the <a href=\"https:\/\/www.newcivilengineer.com\/latest\/wind-turbine-parts-used-emergency-bridge-repair-19-08-2019\/\" target=\"_blank\" rel=\"noopener\">emergency repair<\/a> for the engineering detail.<\/p>\n<h2>How the math on reused steel actually worked out<\/h2>\n<p>None of this happened by luck alone. The supplier promotes repurposed tube on a carbon argument. A life cycle analysis it commissioned found emissions savings as high as <strong>96 percent compared<\/strong> with buying new.<\/p>\n<p>That figure is a company commissioned estimate rather than an independent audit, and the saving comes from skipping the mining, smelting and rolling that a fresh tube would require. Timing mattered just as much as the carbon math.<\/p>\n<p>The crossing between Grinton and Leyburn had to be repaired quickly because it formed part of the route for the UCI Road World Championship. Crews had been working <strong>around the clock<\/strong> since the floods on July 30 and 31, and the two tubes were delivered and rolled into the beck on August 13. A <strong>custom fabricated tube<\/strong> could have taken months to order and roll.<\/p>\n<p>You can read more about how other <a href=\"https:\/\/www.ecoportal.net\/en\/wind-farm-central-spain-swapped-aging\/42892\/\">turbine parts<\/a> find reuse once a project ends, because steel, unlike a cured composite blade, almost never has to be thrown away. That reuse market is what let a scrapped turbine base show up in a Yorkshire beck within a fortnight.<\/p>\n<h2>Why the ocean built the tube strong enough for a road<\/h2>\n<p>Offshore wind hardware is heavily built by the standards of most civil engineering. A substructure meant to hold a turbine in open water is designed around <strong>waves, corrosion and storm loading<\/strong>. That is why the wall here runs more than an inch thick, far beyond what a temporary moorland crossing would normally call for.<\/p>\n<p>That spare capacity became the point. Instead of commissioning something new for a one off emergency, engineers borrowed <strong>capacity built for the sea<\/strong>. The firm&#8217;s managing director, Roy Fishwick, said: &#8220;We were delighted when the council accepted our proposal to deploy steel tubes to repair the bridges.&#8221;<\/p>\n<p>It is the same logic behind other <a href=\"https:\/\/www.ecoportal.net\/en\/colorados-mt-elbert-hides-storage\/42465\/\">retired energy structures<\/a> finding new purpose, whether that is a pumped storage cavern or a turbine column becoming something nobody designed it to be. The original job sets a bar the second job rarely has to clear.<\/p>\n<h2>What happened when the race finally came<\/h2>\n<p>The race the deadline was built around never crossed the steel. On the morning of the elite men&#8217;s road race, organizers shortened the course by <strong>14.6 miles because<\/strong> of forecast severe weather, bypassing the northern loop and cutting out the Buttertubs and Grinton Moor climbs. You can see the <a href=\"https:\/\/www.cyclingnews.com\/news\/world-championships-elite-mens-road-race-shortened-by-24km-due-to-bad-weather\/\" rel=\"nofollow noopener\" target=\"_blank\">late route change<\/a> as organizers announced it.<\/p>\n<p>So the crossing&#8217;s real work was the ordinary kind. It reconnected a dales village with Leyburn for residents, farms and summer visitors, with the traditional Dales masonry bridge due to be rebuilt afterward.<\/p>\n<p>Even so, the episode is a reminder that a cancelled wind project&#8217;s steel does not disappear just because the turbines never got built. Here, <strong>more than 46,000 pounds<\/strong> of structural steel found a use nobody had drawn up on any blueprint.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A stone bridge in the Yorkshire Dales vanished in a single night. Floodwater came down Swaledale carrying boulders and debris. By morning, the crossing over Cogden Beck near Grinton was gone. A road to the nearest market town went with it. Engineers needed something enormous and already built, something nobody was using. They found it &#8230; <a title=\"Floodwater tore out a stone bridge in the Yorkshire Dales overnight, so crews rolled in two 20 foot steel tubes built for a scrapped wind farm\" class=\"read-more\" href=\"https:\/\/www.ecoportal.net\/en\/floodwater-tore-out-steel-tubes-wind\/43329\/\" aria-label=\"Read more about Floodwater tore out a stone bridge in the Yorkshire Dales overnight, so crews rolled in two 20 foot steel tubes built for a scrapped wind farm\">Read more<\/a><\/p>\n","protected":false},"author":28,"featured_media":43335,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rank_math_focus_keyword":"floodwater tore out","rank_math_title":"Floodwater tore out a stone bridge in the Yorkshire Dales overnight, so crews rolled in two 20 foot steel tubes built for a scrapped wind farm","rank_math_description":"Steel tubes built for a canceled Scottish wind farm became an emergency bridge in the Yorkshire Dales after flash floods.","footnotes":""},"categories":[8],"tags":[],"class_list":["post-43329","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy"],"_links":{"self":[{"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/posts\/43329","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/users\/28"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/comments?post=43329"}],"version-history":[{"count":1,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/posts\/43329\/revisions"}],"predecessor-version":[{"id":43336,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/posts\/43329\/revisions\/43336"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/media\/43335"}],"wp:attachment":[{"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/media?parent=43329"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/categories?post=43329"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/tags?post=43329"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}