{"id":44746,"date":"2026-11-03T07:55:56","date_gmt":"2026-11-03T12:55:56","guid":{"rendered":"https:\/\/www.ecoportal.net\/en\/?p=44746"},"modified":"2026-11-03T07:55:56","modified_gmt":"2026-11-03T12:55:56","slug":"michigan-solar-park-ford-electricity","status":"publish","type":"post","link":"https:\/\/www.ecoportal.net\/en\/michigan-solar-park-ford-electricity\/44746\/","title":{"rendered":"Michigan\u2019s completed 100-MW solar park supports Ford\u2019s goal of matching vehicle assembly with carbon-free electricity by 2027"},"content":{"rendered":"<p>Clean electricity is now flowing onto Michigan\u2019s power grid from a newly completed utility array.<\/p>\n<p>The solar park came about due to the involvement of Ford in DTE Energy\u2019s MIGreenPower program.<\/p>\n<p>The facility does more than generate green power\u2014it shows how Ford will <strong>supply enough carbon-free electricity to run<\/strong> all of its assembly plants across the state.<\/p>\n<p>Powering factories this way allows automakers to offset heavy assembly demands with clean energy generated within their own utility service territory.<\/p>\n<h2>One solar park marks the start of a much larger plan<\/h2>\n<p>Cold Creek Solar Park is located approximately five miles northeast of Coldwater, MI, in Branch County.<\/p>\n<p>The facility has a total generating capacity of 100 megawatts, <strong>beginning electricity production and going into full operation<\/strong> in October 2026.<\/p>\n<p>It represents one of the first large sites that were completed by Ford in its overall agreement with DTE Energy.<\/p>\n<p>DTE Energy was responsible for building and financing the photovoltaic panel array through its CleanVision MIGreenPower initiative.<\/p>\n<p>The clean power generated by the site is fed into Michigan&#8217;s existing electric distribution system.<\/p>\n<h3>Reaching Ford&#8217;s target began with a deal signed four years ago<\/h3>\n<p>Four years ago, Ford agreed to purchase 650 megawatts of new solar capacity through DTE Energy&#8217;s MIGreenPower program.<\/p>\n<p>A major part of that agreement was dedicated to supporting Ford&#8217;s goal to power all Michigan assembly plants using carbon-free sources.<\/p>\n<p>Ford expects to <strong>achieve this local milestone by the end<\/strong> of 2027. That puts the state&#8217;s vehicle assembly plants at least two years ahead of the automaker&#8217;s global clean energy timeline.<\/p>\n<p>Achieving 100% carbon-free power at the car plants begins with completing the 100 MW portion of the larger plan at Cold Creek.<\/p>\n<p><img decoding=\"async\" class=\"wp-image-45049 aligncenter\" src=\"https:\/\/www.ecoportal.net\/en\/wp-content\/uploads\/2026\/11\/INFG-Michigans-completed-100-MW-solar-park-supports-Fords-goal-of-matching-vehicle-assembly-with-carbon-free-electricity-by-2027-150x300.jpg\" alt=\"\" width=\"1028\" height=\"2056\" title=\"\" srcset=\"https:\/\/www.ecoportal.net\/en\/wp-content\/uploads\/2026\/11\/INFG-Michigans-completed-100-MW-solar-park-supports-Fords-goal-of-matching-vehicle-assembly-with-carbon-free-electricity-by-2027-150x300.jpg 150w, https:\/\/www.ecoportal.net\/en\/wp-content\/uploads\/2026\/11\/INFG-Michigans-completed-100-MW-solar-park-supports-Fords-goal-of-matching-vehicle-assembly-with-carbon-free-electricity-by-2027-507x1013.jpg 507w, https:\/\/www.ecoportal.net\/en\/wp-content\/uploads\/2026\/11\/INFG-Michigans-completed-100-MW-solar-park-supports-Fords-goal-of-matching-vehicle-assembly-with-carbon-free-electricity-by-2027-768x1536.jpg 768w, https:\/\/www.ecoportal.net\/en\/wp-content\/uploads\/2026\/11\/INFG-Michigans-completed-100-MW-solar-park-supports-Fords-goal-of-matching-vehicle-assembly-with-carbon-free-electricity-by-2027.jpg 887w\" sizes=\"(max-width: 1028px) 100vw, 1028px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h2>Cold Creek turns a long-term commitment into real infrastructure<\/h2>\n<p>Cold Creek Solar Park puts &#8220;flesh&#8221; on that earlier agreement from 2022.<\/p>\n<p>According to <a href=\"https:\/\/ir.dteenergy.com\/news\/press-release-details\/2022\/Ford-Motor-Company-and-DTE-Energy-announce-the-largest-renewable-energy-purchase-from-a-utility-in-U.S.-history\/default.aspx\" target=\"_blank\" rel=\"noopener\">DTE Energy<\/a>, the total of 650 MW in additional solar capacity will increase total statewide solar capacity by almost 70%.<\/p>\n<p>Additionally, if all aspects of Ford&#8217;s agreement are fulfilled, it could eliminate up to 600,000 tons of carbon dioxide emissions.<\/p>\n<p>Once all aspects of the larger agreement are completed, finishing the site will represent one aspect of &#8220;paper&#8221; becoming &#8220;hardware&#8221;.<\/p>\n<h3>The goal was bigger than simply adding renewable power<\/h3>\n<p>Ford specifically designed the entire deal so that it <strong>aligned with a specific manufacturing achievement<\/strong> rather than simply buying a block of green energy.<\/p>\n<p>While generating green electricity, the facility supports this goal as it feeds clean energy into Michigan&#8217;s electrical grid.<\/p>\n<p>Adding clean capacity of this scale strengthens the common local power delivery network that serves both factories and communities.<\/p>\n<h2>The benefits extend beyond Ford&#8217;s assembly plants<\/h2>\n<p>There are other positive outcomes associated with achieving this milestone at Cold Creek.<\/p>\n<p>Beyond supporting Ford\u2019s assembly targets, <strong>construction across the broader agreement will drive<\/strong> local economic growth. Specifically, the buildout is expected to spur job creation, boost municipal tax revenue, and lower regional carbon emissions.<\/p>\n<p>Additionally, the new array will assist with longer-term clean energy goals that exist across Michigan and those set forth by DTE Energy.<\/p>\n<p>Projects like this development directly advance those broader ambitions. A primary example is Michigan&#8217;s statutory goal to obtain 60% of its power from <a href=\"https:\/\/www.ecoportal.net\/en\/india-google-reshape-global-solar-race\/15335\/\">renewable resources<\/a> by 2035.<\/p>\n<h3>Completing the job now depends on what comes next<\/h3>\n<p>Although construction activities at Cold Creek Solar Park are complete, there is much work left to accomplish regarding meeting Ford&#8217;s manufacturing targets.<\/p>\n<p>Solar developments included as part of the procurement commitments continue to expand Michigan&#8217;s portfolio of <a href=\"https:\/\/www.ecoportal.net\/en\/north-africa-gigawatt-solar-farms\/21203\/\">carbon-free power<\/a>.<\/p>\n<p>Now attention shifts to determining if subsequent projects can develop sufficient volumes of power to achieve these production milestones.<\/p>\n<p>Ultimately, the results of this effort will show how closely <strong>Michigan vehicle builds will match carbon-free electricity<\/strong> by December 31st, 2027.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Clean electricity is now flowing onto Michigan\u2019s power grid from a newly completed utility array. The solar park came about due to the involvement of Ford in DTE Energy\u2019s MIGreenPower program. The facility does more than generate green power\u2014it shows how Ford will supply enough carbon-free electricity to run all of its assembly plants across &#8230; <a title=\"Michigan\u2019s completed 100-MW solar park supports Ford\u2019s goal of matching vehicle assembly with carbon-free electricity by 2027\" class=\"read-more\" href=\"https:\/\/www.ecoportal.net\/en\/michigan-solar-park-ford-electricity\/44746\/\" aria-label=\"Read more about Michigan\u2019s completed 100-MW solar park supports Ford\u2019s goal of matching vehicle assembly with carbon-free electricity by 2027\">Read more<\/a><\/p>\n","protected":false},"author":27,"featured_media":44846,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rank_math_focus_keyword":"Michigan,solar,park","rank_math_title":"","rank_math_description":"Michigan solar park helps Ford move closer to matching vehicle assembly with carbon-free electricity while supporting broader renewable energy goals statewide.","footnotes":""},"categories":[8],"tags":[],"class_list":["post-44746","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy"],"_links":{"self":[{"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/posts\/44746","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/comments?post=44746"}],"version-history":[{"count":12,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/posts\/44746\/revisions"}],"predecessor-version":[{"id":45065,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/posts\/44746\/revisions\/45065"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/media\/44846"}],"wp:attachment":[{"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/media?parent=44746"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/categories?post=44746"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ecoportal.net\/en\/wp-json\/wp\/v2\/tags?post=44746"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}