CEO
Carlos Albero Rojas
Carlos is the CEO of Ecoportal and an engineer with strong expertise in technical and industrial topics. He previously worked at international companies such as Siemens and speaks Spanish, German, English, and Italian.
Wind Power
A hydraulic blade lifter raised 21 turbine blades at a steep angle to squeeze them through the narrow streets of the Scottish market town of Hawick, and the deliveries still took a whole winter to finish
SEP 22 · 5 MIN
Solar Power
Grenache vines at a 3,660 square foot pilot in southern France ripened a week later under tilting panels, and a tasting panel found the shaded wines consistently fruitier than the open rows beside them
SEP 21 · 5 MIN
News
A road crew above Fureidis hit a cave sealed for 400,000 years and holding about 100 stone tools, so the new road was built on a bridge over it instead of through it
SEP 21 · 5 MIN
Mobility
Pilots make 3 million ladder climbs a year onto moving hulls worldwide, and a newly mandatory global standard will force every one of those ladders out of service within 36 months of manufacture
SEP 20 · 6 MIN
Machinery
With a 1,200 ton body and only nine minutes of power left, Britain’s last large walking dragline walked backward 160 feet into permanent preservation
SEP 20 · 6 MIN
News
Volunteers typed 3.7 million weather readings out of navy logbook pages from the Pacific war, but the warm ocean those pages describe is probably an artifact of how the temperatures were taken
SEP 16 · 4 MIN
Machinery
A walking dragline in southeastern Ohio picked up 325 tons of earth in a single bite for 22 years and moved twice what the Panama Canal took out, and the only part of it left standing is the bucket
SEP 15 · 4 MIN
Solar Power
Panels laid across 6 flooded gravel pits in northeastern France cover 314 acres and supply about 37 thousand people, but the anchoring alone took 21 weeks and 2 barges before a float went in
SEP 14 · 5 MIN
Wind Power
A sign gantry spanning 40 feet over a Houston roadway was cut from 1 retired turbine blade and rode out a hurricane with gusts over 100 miles an hour, where the material bill came in far under steel
SEP 14 · 5 MIN
Construction
Steel arch spans weighing 5 million pounds each rode the Hudson River for 30 hours apiece, and crews then jacked all three of them 60 feet straight up over the Hackensack
SEP 13 · 5 MIN